The best way to Hold a Ceiling Gentle: A Step-by-Step Information

A ceiling mild not solely may be an object of magnificence, it additionally satisfies code necessities for switch-operated room illumination. You’ll be able to hold a ceiling mild in an hour or two, even when the ceiling presently has no electrical field.

Kind of Field to Hold a Ceiling Gentle

A plastic field or a braced steel previous work electrical field safely accommodates the wiring and bodily helps the ceiling mild. The kind of electrical field to make use of is mainly primarily based on the burden of the ceiling mild fixture.

  • Fixtures below six kilos: Hold the ceiling mild on a spherical, 4-inch PVC previous work field put in instantly throughout the ceiling drywall—no bracing.
  • Fixtures over six kilos: Hold the ceiling mild on a spherical, 4-inch steel previous work field with an hooked up steel brace or hanger bar.

Tip

Necessary: {The electrical} field should be specified as “previous work.” Previous work signifies that the ceiling drywall is already put in. A brand new work or new-construction field is just for ceilings that do not but have drywall.

Ceiling Gentle Fixture Weights

Many ceiling lighting fixtures stay under the six pound restrict that permits them to be put in on plastic previous work bins.

Weightier ceiling lights are usually bigger or they use heavy supplies like glass for the dome or diffuser. Heavy fixtures might have extras like on-board battery backup models.

Security Issues

Flip off energy to all wires that run by means of the ceiling. Shut off the ability on the electrical service panel.

Put on a mud masks when chopping the drywall or working throughout the ceiling. Drywall mud is an irritant. Ceilings can include fiberglass, rodent feces, black mould, and different particles that produce dangerous mud.

Supplies

  • Ceiling mild
  • 4-inch PVC previous work spherical electrical field (as wanted)
  • 4-inch steel previous work spherical electrical field with brace (as wanted)
  • Cable clamps (for steel bins)
  • Painter’s tape

The best way to Hold a Ceiling Gentle (6 Kilos or Much less)

Use a 4-inch plastic (PVC) previous work field to hold a ceiling mild that weighs six kilos or much less.

An previous work electrical field is supported by the ceiling drywall alone. Adjustable mounting ears seize the ceiling drywall from the again to carry it in place.


  1. Find the Ceiling Joists

    Slide the stud finder throughout the meant set up space to seek out the ceiling joists. Mark the joists on either side of the set up space with a number of tabs of painter’s tape.


  2. Measure to the Set up Spot

    Measure between neighboring joists with the measuring tape. Decide the middle spot by halving the quantity. Mark the middle spot with the pencil.

    Tip

    An previous work plastic field does not all the time should be on the middle of two joists. But it surely does should be one to 2 inches away from a joist in order that the field’s attachment ears have room to open.


  3. Minimize the Ceiling Gap

    Minimize a 4-inch-diameter gap within the ceiling drywall with the outlet noticed hooked up to the electrical drill. Or, manually minimize the outlet with a drywall jab noticed.


  4. Clear the Ceiling Gap

    Clear contained in the ceiling gap by hand, eradicating insulation and different particles. With the utility knife, minimize away ragged edges produced by chopping the outlet.


  5. Insert the Wires within the Field

    Use fish tape to drag the electrical cable to the set up spot. Insert the electrical cable into the again of the previous work plastic electrical field.


  6. Insert the Field within the Ceiling Gap

    Push {the electrical} field into the ceiling gap and maintain it in place along with your free hand.


  7. Tighten the Ceiling Field

    Tighten the 2 or three screws (relying on the producer) on the outer body of {the electrical} field by turning them clockwise.

    Proceed to press upward along with your free hand till all attachment ears are firmly in place.


  8. Connect the Mounting Straps to the Ceiling Field

    Screw the pair of flat mounting straps included with the ceiling mild to {the electrical} field.


  9. Connect the Wires to the Ceiling Gentle

    Connect the wires of the electrical cable to like-colored wires on the ceiling mild or as directed by the product directions.


  10. Hold the Ceiling Gentle

    Screw the bottom of the ceiling mild onto the mounting strap and fix the dome or diffuser.

    By

    Leave a Reply

    Your email address will not be published. Required fields are marked *